![]() ![]() for properties subject to a waterways permit, the proposed ground elevations and lot grade design must meet the conditions of the waterways permit. ![]() Indicate flood protection level (FPL) if development is located within flood fringe area. distances to flood line if development is located within flood fringe area.building location and distances to other buildings, property lines, driveways, etc.,.project location with reference to adjoining streets (street names) or dimensions to street corners at mid-block locations.drawing scale no less than 1:500 (metric).civic address and legal description of the property.be prepared by a professional engineer, Manitoba Land Surveyor, landscape architect or architect as required in the Lot Grading By-law,.Lot grading requirements / considerations.To apply for lot grading permits, contact the Planning, Property and Development Department, Zoning and Permits Branch. You should apply for a lot grading permit at least 5 working days before you start the work.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |